Groundforce Bridge delivers temporary bridges to site and offers an easily installed flat pack bridge solution to suit any requirements. The bridges are delivered to site and the simple installation and ‘flat pack’ style means there is no requirement for expensive heavy-duty lifting devices or machinery, making Groundforce Bridge one of the fastest and cost-efficient temporary bridging solutions available
I.F.T.Services competed the supply and fabrication of six aluminium temporary bridges for Groundforce Bridging within a four-week turnaround from design to build. With delivery by road an impossibility due to the remote locations in Ireland, the new 10m aluminium Pedestrian Bridges needed to be delivered and installed via helicopter. By keeping the bridges as light as possible using aluminium it was possible to complete the unusual task at hand.
700kg total weight, 0.9m wide, 10.0m long.
Testimonial
Groundforce bridge would like to take this opportunity to thank you and all the team at IFT Services for your hard work and dedication over the past six years.
IFT Services has been a major part in the growth of Groundforce Bridge. With the increased requirements for stock levels due to high demand, your team have continually delivery on time. Most recent completing six aluminium bridges, designed and built in four-week turnaround, helping us meet out tight customer deadline.
Mr Terry Mead
Bridging Director